Production sites

Soumagne

X

1 - Western Technic Center

  • A showroom of 4,000m² to welcome customers and exhibit the range of JOSKIN products
joskin youtube
Close
X

2 - JOSKIN group's development centre

  • Know-how: 45 years of experience in the manufacturing of agricultural material for transport and spreading
  • In-house competence: mastery of all strategic stages of the production chain
  • Constant innovation: always looking for solutions that meet new demands
  • Computer-aided design: Pro-Engineer
Close
X

3 - Digital control lathes

  • 20 lathes, machining centres and saws with digital control
  • Part-by-part production
  • Fully automatic loading by robot
  • Automatic "arming" by pneumatic advance of the profile (except rod)
Close
X

4 - Profile storing and cutting

  • New building with 2 cutting lasers for tubes
  • Fully automated cutting of steel profiles and tubes (max. length: 12m and max. diameter: 406mm)
  • Precision, regularity and reliability guaranteed for the assembly
Close
X

5 - Welding robots

7 automated welding robots to weld series of parts
1 robot to weld the tipping trailer bodies very precisely in 7 hours!
  • Automation
  • Exact jigs, precise programming and components
  • Automatic correction of the unevennesses before welding
Close
X

6 - Laser cutting

  • 9 laser cutting tables processing 14,500 tons of steel a year
  • High precision and regularity when cutting steel sheets
  • A steel sheet of 10mm thick is cut in approx. one hour and a half, according to its size and the complexity of the parts
Close
X

7 - Folding press

14 automated folding machines
The biggest is unique in Europe:
  • it develops a power of 600 tons pressure
  • it can work steel sheets up to 8m long and 10mm thick
  • it can fold high tensile steel sheets
Close
X

8 - Assembly of boggies and welding of chassis

  • Welding of the chassis on jigs
  • Assembly of the running gears according to their equipment and certification (hydraulic, air, dual brakes)
  • Welding of the different elements on jigs
Close
X

9 - Logistics

The spare parts books are developed, created and produced under control of the business management software SAP.
Close
X

10 - Painting

  • Separate treatment of the components for an optimal quality and protection of the steel
  • Shot-blasting of the components (projection of 2,200kg of steel microballs per minute to clean the steel so that paint can stick to it)
  • Primer Ester Epoxy (2K)
  • Finishing lacquer (2K) (total 100µ)
  • Forced drying (60° oven)
Close
X

11 - Assembly - Drakkar and Tornado3

  • New areas to assemble the DRAKKAR and Tornado3 vehicles
  • Increase of the production capacity in order to meet the growing demand for these vehicles
joskin youtube
Close
X

12 - Assembly and finishing of tankers

  • Reorganized assembly line according to the vehicle type
  • Better specialized staff for more efficiency given the complexity of the vehicles
Close
X

13 - Assembly and finishing or rear implements

  • Test and check of every finished vehicle before they are collected
  • Assembly of the spreading implements (booms and injectors) on slurry tankers
Close
X

14 - Exhibition of stock machines

New exhibition and storage hall of 12,000m² for stock machines joskin youtube
Close
X

15 - Storage of spare parts

  • Fully automated warehouse for spare parts
  • Dimensions of the parts up to 4,000 x 1,200mm
  • 4 rows of 90m long and 12m high
  • Guarantee for an efficient and reactive after-sales service
Close
X

16 - Shop

  • Warehouse for the different articles with the JOSKIN logo
  • Wide range of articles: overalls, t-shirts, jackets, office supplies, etc.
  • Approx. 40 models of JOSKIN miniatures available
joskin youtube
Close