This website uses cookies to optimize your user experience. By navigating on this website, you consent to this use. To find out more about cookies, consult our privacy policy.

Production sites

Soumagne

X

1 - Western Technic Center

  • A showroom of 4,000m² to welcome customers and exhibit the range of JOSKIN products
joskin youtube
Close
X

2 - JOSKIN group's development centre

  • Know-how: 45 years of experience in the manufacturing of agricultural material for transport and spreading
  • In-house competence: mastery of all strategic stages of the production chain
  • Constant innovation: always looking for solutions that meet new demands
  • Computer-aided design: Pro-Engineer
Close
X

3 - Digital control lathes

  • 20 lathes, machining centres and saws with digital control
  • Part-by-part production
  • Fully automatic loading by robot
  • Automatic "arming" by pneumatic advance of the profile (except rod)
Close
X

4 - Profile storing and cutting

  • New building with 2 cutting lasers for tubes
  • Fully automated cutting of steel profiles and tubes (max. length: 12m and max. diameter: 406mm)
  • Precision, regularity and reliability guaranteed for the assembly
Close
X

5 - Welding robots

7 automated welding robots to weld series of parts
1 robot to weld the tipping trailer bodies very precisely in 7 hours!
  • Automation
  • Exact jigs, precise programming and components
  • Automatic correction of the unevennesses before welding
Close
X

6 - Laser cutting

  • 9 laser cutting tables processing 14,500 tons of steel a year
  • High precision and regularity when cutting steel sheets
  • A steel sheet of 10mm thick is cut in approx. one hour and a half, according to its size and the complexity of the parts
Close
X

7 - Folding press

14 automated folding machines
The biggest is unique in Europe:
  • it develops a power of 600 tons pressure
  • it can work steel sheets up to 8m long and 10mm thick
  • it can fold high tensile steel sheets
Close
X

8 - Assembly of boggies and welding of chassis

  • Welding of the chassis on jigs
  • Assembly of the running gears according to their equipment and certification (hydraulic, air, dual brakes)
  • Welding of the different elements on jigs
Close
X

9 - Logistics

The spare parts books are developed, created and produced under control of the business management software SAP.
Close
X

10 - Painting

  • Separate treatment of the components for an optimal quality and protection of the steel
  • Shot-blasting of the components (projection of 2,200kg of steel microballs per minute to clean the steel so that paint can stick to it)
  • Primer Ester Epoxy (2K)
  • Finishing lacquer (2K) (total 100µ)
  • Forced drying (60° oven)
Close
X

11 - Assembly - Drakkar and Tornado3

  • New areas to assemble the DRAKKAR and Tornado3 vehicles
  • Increase of the production capacity in order to meet the growing demand for these vehicles
joskin youtube
Close
X

12 - Assembly and finishing of tankers

  • Reorganized assembly line according to the vehicle type
  • Better specialized staff for more efficiency given the complexity of the vehicles
Close
X

13 - Assembly and finishing or rear implements

  • Test and check of every finished vehicle before they are collected
  • Assembly of the spreading implements (booms and injectors) on slurry tankers
Close
X

14 - Exhibition of stock machines

New exhibition and storage hall of 12,000m² for stock machines joskin youtube
Close
X

15 - Storage of spare parts

  • Fully automated warehouse for spare parts
  • Dimensions of the parts up to 4,000 x 1,200mm
  • 4 rows of 90m long and 12m high
  • Guarantee for an efficient and reactive after-sales service
Close
X

16 - Shop

  • Warehouse for the different articles with the JOSKIN logo
  • Wide range of articles: overalls, t-shirts, jackets, office supplies, etc.
  • Approx. 40 models of JOSKIN miniatures available
joskin youtube
Close