(A) Floor in chequered plate with a 2.5 cm edge to better hold the load.
(B) Automatic shot-blasting with 20 turbines (2,300 kg shot/min).
(C) 2K primer coat applied directly after blasting + flash-off before applying the finish.
(D) 2K topcoat with accelerated drying at 60°C.